Hyung-Joon Seo
- An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. In: Architectural Engineering and Design Management, v. 20, n. 2 (November 2023). (2023):
- Net load–displacement estimation in soil-nail pullout tests. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 170, n. 6 (December 2017). (2017):
- A TBM 현장에서 막장전방 예측기법 결과의 확률론적 분석을 통한 지반상태 평가 (probabilistic assessment of ground condition prediction ahead of TBM tunnels combining each geophysical prediction method). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 18, n. 3 (May 2016). (2016):
- 3차원 레이저 스캐너 및 BIM을 활용한 터널 과대.과소 굴착 평가 (Assessment of over / under-break of tunnel utilizing BIM and 3D laser scanner). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 14, n. 4 (31 July 2012). (2012):
- A 전기비저항 검층으로 얻은 전기비저항과 터널 현장 암반등급의 상관관계에 관한 연구 (study on correlation between electrical resistivity obtained from electrical resistivity logging and rock mass rating in-situ tunnelling site). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 14, n. 5 (30 September 2012). (2012):
- A 지하공간하부 지하저류공동에서의 필라 보강효과에 관한 수치해석적 연구 (numerical study of pillar reinforcing effect in underground cavern underneath existing structures). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 14, n. 5 (30 September 2012). (2012):
- Optimization of soil nailing design considering three failure modes. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014). (2014):
- Numerical and experimental investigation of pillar reinforcement with pressurized grouting and pre-stress. In: Tunnelling and Underground Space Technology, v. 54 (April 2016). (2016):