Ahmed B. Senouci
- Material cost minimization of concrete wall forms. In: Building and Environment, v. 32, n. 1 (January 1997). (1997):
- Optimizing Resource Utilization during the Recovery of Civil Infrastructure Systems. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010). (2010):
- Multiobjective Optimization Model for Scheduling of Construction Projects Under Extreme Weather. In: Journal of Civil Engineering and Management, v. 22, n. 3 (March 2016). (2016):
- Rubber‐Tire Particles as Concrete Aggregate. In: Journal of Materials in Civil Engineering (ASCE), v. 5, n. 4 (November 1993). (1993):
- Dynamic Programming Approach to Scheduling of Nonserial Linear Project. In: Journal of Computing in Civil Engineering, v. 10, n. 2 (April 1996). (1996):
- Use of Scrap Tires in Road Construction. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992). (1992):
- Design Optimization of Concrete-Slab Forms. In: Journal of Construction Engineering and Management, v. 121, n. 2 (June 1995). (1995):
- Resource Scheduling Using Neural Dynamics Model of Adeli and Park. In: Journal of Construction Engineering and Management, v. 127, n. 1 (February 2001). (2001):
- A Pavement Condition-Rating Model Using Backpropagation Neural Networks. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 6 (November 1995). (1995):
- Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009). (2009):
- Use of Genetic Algorithms in Resource Scheduling of Construction Projects. In: Journal of Construction Engineering and Management, v. 130, n. 6 (December 2004). (2004):
- Engineering properties of rubberized concrete. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 19, n. 5 (October 1992). (1992):
- NEUROSLAB – neural network system for horizontal formwork selection. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 4 (August 1995). (1995):
- Condition rating of rigid pavements by neural networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 5 (October 1995). (1995):
- Scheduling and control of linear projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 21, n. 2 (April 1994). (1994):
- A time – cost trade-off algorithm for nonserial linear projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 1 (February 1996). (1996):