Shlomo Selinger
- Payment Timing as a Factor in Bid Evaluation. In: Journal of Construction Engineering and Management, v. 109, n. 3 (September 1983). (1983):
- Economic Service Life of Building Construction Equipment. In: Journal of Construction Engineering and Management, v. 109, n. 4 (December 1983). (1983):
- Computerized method for quantity surveying. In: Construction Management and Economics, v. 1, n. 1 (March 1983). (1983):