Mohammed A. Salem Hiyassat
- Modification of Minimum Moment Approach in Resource Leveling. In: Journal of Construction Engineering and Management, v. 126, n. 4 (July 2000). (2000):
- Applying Modified Minimum Moment Method to Multiple Resource Leveling. In: Journal of Construction Engineering and Management, v. 127, n. 3 (June 2001). (2001):
- Construction bid price evaluation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001). (2001):
- Construction bid price evaluation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001). (2001):