Hisham M. M. Said
- Construction spatial modeling and scheduling with three-dimensional singularity functions. In: Automation in Construction, v. 43 (July 2014). (2014):
- Float Types in Construction Spatial Scheduling. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016). (2016):