- Energy management of community energy storage in grid-connected microgrid under uncertain real-time prices. In: Sustainable Cities and Society, v. 66 (March 2021). (2021):
- Developing a Comprehensive Risk Assessment Model Based on Fuzzy Bayesian Belief Network (FBBN). In: Journal of Civil Engineering and Management, v. 26, n. 7 (9 July 2020). (2020):
- Memetic algorithm for solving resource constrained project scheduling problems. In: Automation in Construction, v. 111 (March 2020). (2020):
- Allocation and Management of Cost Contingency in Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 6 (November 2016). (2016):
- Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018). (2018):