0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Russell, Lisa (2010): Padma Bridge opens to prequalifications. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010).
  2. Russell, Lisa (2010): Turkey plans two major suspension bridges. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010).
  3. Russell, Lisa (2009): Quality time. New corporate sponsorship is enabling the volunteer-based charity Bridges to Prosperity to expand ist programme of building bridges in remote places, to the benefit of local communities …. In: Bridge Design & Engineering, v. 15, n. 56 (3rd Quarter 2009).
  4. Russell, Lisa (2009): Sensors working overtime. The need to know more about the conditions inside the cables of New York City's trio of historic suspension bridges is the impetus for an ongoing research project. In: Bridge Design & Engineering, v. 15, n. 55 (2nd Quarter 2009).
  5. Russell, Lisa (2009): Insider knowledge. Instrumentation and testing of a section of cable based on the ones for the new self-anchored suspension bridge in San Francisco will provide data for a structural health monitoring system being developed. In: Bridge Design & Engineering, v. 15, n. 55 (2nd Quarter 2009).
  6. Russell, Lisa (2007): Hardanger bridge tenders due this year. In: Bridge Design & Engineering, v. 13, n. 46 (1st Quarter 2007).
  7. Russell, Lisa (2006): Ammann's masterpieces reach 75. In: Bridge Design & Engineering, v. 12, n. 45 (4th Quarter 2006).
  8. Russell, Lisa (2006): Elegant footbridge connects border resorts. In: Bridge Design & Engineering, v. 12, n. 45 (4th Quarter 2006).
  9. Russell, Lisa (2006): Bids invited for extradosed Q-bridge. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006).
  10. Russell, Lisa (2006): Concrete detoriation forces Liberty Memorial Bridge closure. In: Bridge Update, n. 58 (March 2006).
  11. Russell, Lisa (2006): Green light for Norway's longest suspension bridge. In: Bridge Update, n. 58 (March 2006).
  12. Russell, Lisa (2006): Overnight lift raises new Parisian landmark. In: Bridge Design & Engineering, v. 12, n. 42 (1st Quarter 2006).
  13. Russell, Lisa (2005): Footbridge Awards 2005. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005).
  14. Russell, Lisa (2006): In the Fold. In: Bridge Update, n. 57 (January 2006).
  15. Russell, Lisa (2006): Three become one on motorway widening scheme. In: Bridge Update, n. 57 (January 2006).
  16. Russell, Lisa (2005): New system to pinpoint active steel cracks. In: Bridge Update, n. 56 (December 2005).
  17. Russell, Lisa (2005): Mississippi Bridge scaled down to save money. In: Bridge Update, n. 56 (December 2005).
  18. Russell, Lisa (2005): End in sight for Paddington deck launch. In: Bridge Update, n. 54 (September 2005).
  19. Russell, Lisa (2005): Tacoma gears up for cable-spinning. In: Bridge Update, n. 54 (September 2005).
  20. Russell, Lisa (2005): Maine's new crossing takes shape. In: Bridge Update, n. 51 (April 2005).
  21. Russell, Lisa (2005): Calatrava landmark for Holy City. In: Bridge Design & Engineering, v. 11, n. 38 (1st Quarter 2005).
  22. Russell, Lisa (2005): Night-time manoeuvers spell success for Richmond-San Rafael rebuild. In: Bridge Design & Engineering, v. 11, n. 38 (1st Quarter 2005).
  23. Russell, Lisa (2004): Ohio River designers get on their marks. In: Bridge Update, n. 48 (December 2004).
  24. Russell, Lisa (2004): Peace gets a chance. In: Bridge Design & Engineering, v. 10, n. 37 (4th Quarter 2004).
  25. Russell, Lisa (2004): Second accident mars Maumee restart. In: Bridge Design & Engineering, v. 10, n. 37 (4th Quarter 2004).
  26. Russell, Lisa (2004): Deadline extended for Messina applications. In: Bridge Design & Engineering, v. 10, n. 36 (3rd Quarter 2004).
  27. Russell, Lisa (2004): Marathon effort gets Florida traffic flowing again. In: Bridge Update, n. 47 (October 2004).
  28. Russell, Lisa (2004): Proposal sparks Virginia contest. In: Bridge Update, n. 47 (October 2004).
  29. Russell, Lisa (2004): Few bids - but many birds - expected for mammoth Messina bridge. In: Bridge Update, n. 44 (June 2004).
  30. Russell, Lisa (2004): Condemned bridge used in ship collision research. In: Bridge Update, n. 43 (April 2004).
Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine