Timothy Rose
- Client recommendations for financial incentives on construction projects. In: Engineering, Construction and Architectural Management, v. 17, n. 3 (May 2010). (2010):
- Effects of physical fatigue on the induction of mental fatigue of construction workers: A pilot study based on a neurophysiological approach. In: Automation in Construction, v. 120 (December 2020). (2020):
- Motivational misalignment on an iconic infrastructure project. In: Building Research & Information, v. 38, n. 2 ( 2010). (2010):
- Patent Cooperative Patterns and Development Trends of Chinese Construction Enterprises: A Network Analysis. In: Journal of Civil Engineering and Management, v. 25, n. 3 (June 2019). (2019):
- Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain?. In: Construction Innovation, v. 19, n. 2 (April 2019). (2019):
- (2019): Developing Shuffled Frog-Leaping Algorithm (SFLA) Method to Solve Power Load-Constrained TCRTO Problems in Civil Engineering. In: Advances in Civil Engineering, v. 2019 ( 2019).
- Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review. In: Architectural Engineering and Design Management, v. 14, n. 1-2 (December 2017). (2017):