M. Rogers
- The Use of Eia Techniques and Methodology Within The Road Planning System in The Republic of Ireland.. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 93, n. 1 (March 1992). (1992):
- Option Choice For Major Waste Management Projects - Two Case Studies.. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 133, n. 3 (September 1999). (1999):
- Physical planning in Ireland: lessons from the Masonite decision. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 145, n. 2 (June 2001). (2001):
- Sidelining politicians and communities in siting landfill facilities. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 145, n. 2 (June 2001). (2001):
- Attempting to deliver better municipal engineering services in Ireland. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 145, n. 4 (December 2001). (2001):
- Strategic environmental assessment for wind farm sites. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 160, n. 2 (June 2007). (2007):
- Innovative concepts for aerodynamic control of wind turbine rotors. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 39, n. 1-3 (January 1992). (1992):
- Congestion charging in Dublin. In: Proceedings of the Institution of Civil Engineers - Transport, v. 161, n. 3 (August 2008). (2008):
- Traffic-flow impact of toll booths on M50 motorway, Dublin. In: Proceedings of the Institution of Civil Engineers - Transport, v. 160, n. 1 (February 2007). (2007):
- The basis for Dublin's transportation policy beyond 2000. In: Proceedings of the Institution of Civil Engineers - Transport, v. 141, n. 3 (August 2000). (2000):
- Ensouillage par charrue d'un gazoduc de 120 km de long en mer du Nord (Brae - Heimdal). In: Travaux, n. 604 (November 1985). (1985):