0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Alain Robillard

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Robillard, Alain (2002): La section Tulle Est / Ussel Ouest est ouverte!. In: Travaux, n. 788 (July - August 2002).
  2. Muller, Jean / Tanis, Jean-Marc / Menuel, Frédéric / Montens, Serge / Giacomelli, Daniel / Ailleret, Xavier / Hénault, Sophie / Robillard, Alain / Lacaze, Jean-Jacques / Vesval, Vincent / Dublé, Patrick / Berlottier, Jean-Vincent (2002): Viaduc de Chavanon. The Chavanon viaduct. Presented at: First fib Congress, 13-19.10.2002, Osaka, Japan.
  3. Robillard, Alain / Calas, Gilles (2002): Le franchissement de la vallée de la Dordogne à Souillac (Lot) sur l'A20. La démarche du maître d'ouvrage. In: Travaux, n. 782 (January 2002).
Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine