Nagui I. Riad
- Integrated System for Managing Owner‐Directed Project Acceleration. In: Journal of Construction Engineering and Management, v. 120, n. 1 (March 1994). (1994):
- Computerized Time Impact Analysis for Project Acceleration. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 2 (March 1995). (1995):