Hong-Chul Rhim
- Top Down 공사의 선기둥 수직도 계측 (Measurement of Prefounded Column Erection During Top Down Construction). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 6, n. 4 (December 2006). (2006):
- 굴착순서에 따른 Top Down 선기둥 지지력 산정 (Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 6, n. 4 (December 2006). (2006):
- CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구 (Study on Development of CWS (buried wale Continuous Wall System) Method). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 6, n. 2 (June 2006). (2006):
- Development of an Optimum Pre-founded Column System for Top-down Construction. In: Journal of Civil Engineering and Management, v. 18, n. 5 (September 2012). (2012):