V. Rathinakumar
- Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach. In: Asian Journal of Civil Engineering, v. 26, n. 2 (November 2024). (2024):
- NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects. In: Asian Journal of Civil Engineering, v. 25, n. 7 (July 2024). (2024):
- Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects. In: Asian Journal of Civil Engineering, v. 25, n. 6 (24 June 2024). (2024):