0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

M. Motiar Rahman

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Rahman, M. Motiar / Kumaraswamy, M. M. (2002): Risk management trends in the construction industry: moving towards joint risk management. In: Engineering, Construction and Architectural Management, v. 9, n. 2 (February 2002).

    https://doi.org/10.1108/eb021210

  2. Kumaraswamy, Mohan M. / Ling, Florence Y. Y. / Anvuur, Aaron M. / Rahman, M. Motiar (2007): Targeting relationally integrated teams for sustainable PPPS. In: Engineering, Construction and Architectural Management, v. 14, n. 6 (November 2007).

    https://doi.org/10.1108/09699980710829030

  3. Rahman, M. Motiar (2014): Barriers of Implementing Modern Methods of Construction. In: Journal of Management in Engineering (ASCE), v. 30, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000173

  4. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2008): Relational Contracting and Teambuilding: Assessing Potential Contractual and Noncontractual Incentives. In: Journal of Management in Engineering (ASCE), v. 24, n. 1 (January 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:1(48)

  5. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2004): Potential for Implementing Relational Contracting and Joint Risk Management. In: Journal of Management in Engineering (ASCE), v. 20, n. 4 (October 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:4(178)

  6. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2004): Contracting Relationship Trends and Transitions. In: Journal of Management in Engineering (ASCE), v. 20, n. 4 (October 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:4(147)

  7. Ling, Florence Yean Yng / Rahman, M. Motiar / Ng, Tiong Lian (2006): Incorporating Contractual Incentives to Facilitate Relational Contracting. In: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)1052-3928(2006)132:1(57)

  8. Kumaraswamy, Mohan M. / Miller, Christopher J. / Rahman, M. Motiar / Pickernell, David G. / Thomas Ng, S. / Wong, Israel P. Y. (2006): Developing Web-based Tools for Teaching, Training, Learning and Development. The Role of Academic Institutions. In: Architectural Engineering and Design Management, v. 2, n. 1-2 (January 2006).

    https://doi.org/10.1080/17452007.2006.9684610

  9. Kumaraswamy, Mohan M. / Ling, Florence Yean / Rahman, M. Motiar / Phng, Siew Ting (2005): Constructing Relationally Integrated Teams. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1076)

  10. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2005): Relational Selection for Collaborative Working Arrangements. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1087)

  11. Kumaraswamy, Mohan M. / Rahman, M. Motiar / Ling, Florence Yean / Phng, Siew Ting (2005): Reconstructing Cultures for Relational Contracting. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1065)

  12. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2012): Multicountry Perspectives of Relational Contracting and Integrated Project Teams. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000463

  13. Kumaraswamy, Mohan M. / Palaneeswaran, Ekambaram / Rahman, M. Motiar / Ugwu, Onuegbu O. / Ng, S. Thomas (2006): Synergising R&D initiatives for e-enhancing management support systems. In: Automation in Construction, v. 15, n. 6 (November 2006).

    https://doi.org/10.1016/j.autcon.2005.10.001

  14. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2002): Joint risk management through transactionally efficient relational contracting. In: Construction Management and Economics, v. 20, n. 1 (January 2002).

    https://doi.org/10.1080/01446190110089682

  15. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2005): Assembling integrated project teams for joint risk management. In: Construction Management and Economics, v. 23, n. 4 (May 2005).

    https://doi.org/10.1080/01446190500040083

  16. Rahman, M. Motiar / Kumaraswamy, Mohan M. / Ling, Florence Yean Yng (2007): Building a relational contracting culture and integrated teams. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 1 (January 2007).

    https://doi.org/10.1139/l06-119

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine