0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Andrew D. F. Price

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Wanigarathna, Nadeeshani / Sherratt, Fred / Price, Andrew D. F. / Austin, Simon (2021): Sources and flow of healthcare built environment design evidence. In: Built Environment Project and Asset Management, v. 11, n. 5 (July 2021).

    https://doi.org/10.1108/bepam-08-2020-0144

  2. Muya, Mundia / Price, Andrew D. F. / Edum‐Fotwe, Francis T. (2006): Construction craft skills requirements in sub‐Saharan Africa: a focus on Zambia. In: Engineering, Construction and Architectural Management, v. 13, n. 3 (May 2006).

    https://doi.org/10.1108/09699980610669660

  3. Ng, K. W. Andy / Price, Andrew D. F. (2014): Essential Causes Of The Critical Site Coordination Problems In Building Projects: A Hong Kong Study. In: Organization, Technology and Management in Construction, v. 6, n. 1 ( 2014).

    https://doi.org/10.5592/otmcj.2014.1.7

  4. Sheth, Amey Z. / Price, Andrew D. F. / Glass, Jacqueline (2011): A Framework and Parametric Tools to Facilitate Refurbishment of Existing Healthcare Facilities: Healthcare Energy and Refurbishment (HEaR) Framework. In: The International Journal of the Constructed Environment, v. 1, n. 3 ( 2011).

    https://doi.org/10.18848/2154-8587/cgp/v01i03/37480

  5. Pascale, Federica / Pantzartzis, Efthimia / Krystallis, Ilias / Price, Andrew D. F. (2020): Rationales and practices for dynamic stakeholder engagement and disengagement. Evidence from dementia-friendly health and social care environments. In: Construction Management and Economics, v. 38, n. 7 (February 2020).

    https://doi.org/10.1080/01446193.2019.1679383

  6. Mahadkar, Sameedha / Mills, Grant / Price, Andrew D. F. (2012): Stakeholder consultation practices within healthcare infrastructure planning. A conceptual approach to strategic asset management. In: Built Environment Project and Asset Management, v. 2, n. 2 (November 2012).

    https://doi.org/10.1108/20441241211280882

  7. Mills, Grant R. W. / Phiri, Michael / Erskine, Jonathan / Price, Andrew D. F. (2015): Rethinking healthcare building design quality: an evidence-based strategy. In: Building Research & Information, v. 43, n. 4 ( 2015).

    https://doi.org/10.1080/09613218.2015.1033880

  8. Pantzartzis, Efthimia / Deka, Lipika / Price, Andrew D. F. / Tann, Chris / Mills, Grant R. W. / Rich-Mahadkar, Sameedha (2016): Sustainable management of NHS assets backlog maintenance. In: Built Environment Project and Asset Management, v. 6, n. 5 (November 2016).

    https://doi.org/10.1108/bepam-09-2015-0055

  9. Ng, Andy K. W. / Price, Andrew D. F. (2010): Optimizing the Time Performance of Subcontractors in Building Projects. In: Australasian Journal of Construction Economics and Building, v. 10, n. 1-2 (July 2010).

    https://doi.org/10.5130/ajceb.v10i1-2.1591

  10. Price, Andrew D. F. / Bryman, Alan / Dainty, Andrew R. J. (2004): Empowerment as a Strategy for Improving Construction Performance. In: Leadership and Management in Engineering (ASCE), v. 4, n. 1 (January 2004).

    https://doi.org/10.1061/(asce)1532-6748(2004)4:1(27)

  11. Mathur, Vivek Narain / Price, Andrew D. F. / Austin, Simon (2008): Conceptualizing stakeholder engagement in the context of sustainability and its assessment. In: Construction Management and Economics, v. 26, n. 6 (June 2008).

    https://doi.org/10.1080/01446190802061233

  12. Dainty, Andrew R. J. / Bryman, Alan / Price, Andrew D. F. / Greasley, Kay / Soetanto, Robby / King, Nicola (2005): Project affinity: the role of emotional attachment in construction projects. In: Construction Management and Economics, v. 23, n. 3 (March 2005).

    https://doi.org/10.1080/01446190500040596

  13. Harty, Chris / Goodier, Chris Ian / Soetanto, Robby / Austin, Simon / Dainty, Andrew R. J. / Price, Andrew D. F. (2007): The futures of construction: a critical review of construction future studies. In: Construction Management and Economics, v. 25, n. 5 (May 2007).

    https://doi.org/10.1080/01446190600879117

  14. Kappia, Joseph Gaiva / Dainty, Andrew R. J. / Price, Andrew D. F. (2007): Prioritising career development in relation to recruitment and retention: a trade and craft perspective. In: Construction Management and Economics, v. 25, n. 3 (March 2007).

    https://doi.org/10.1080/01446190600863145

  15. Aouad, Ghassan / Price, Andrew D. F. (1994): Construction planning and information technology in the UK and US construction industries: a comparative study. In: Construction Management and Economics, v. 12, n. 2 (March 1994).

    https://doi.org/10.1080/01446199400000016

  16. Ruan, Ximing / Ochieng, Edward G. / Price, Andrew D. F. / Egbu, Charles O. (2012): Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working. In: Construction Management and Economics, v. 30, n. 1 (January 2012).

    https://doi.org/10.1080/01446193.2011.654127

  17. Agapiou, Andrew / Price, Andrew D. F. / McCaffer, Ron (1995): Planning future construction skill requirements: understanding labour resource issues. In: Construction Management and Economics, v. 13, n. 2 (March 1995).

    https://doi.org/10.1080/01446199500000017

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine