0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A. D. F. Price

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Soetanto, R. / Dainty, A. R. J. / Glass, J. / Price, A. D. F. (2004): Criteria for assessing the potential performance of hybrid concrete structural frames. In: Engineering, Construction and Architectural Management, v. 11, n. 6 (December 2004).

    https://doi.org/10.1108/09699980410570175

  2. Bassioni, H. A. / Hassan, T. M. / Price, A. D. F. (2008): Evaluation and analysis of criteria and sub‐criteria of a construction excellence model. In: Engineering, Construction and Architectural Management, v. 15, n. 1 (January 2008).

    https://doi.org/10.1108/09699980810842043

  3. Ibrahim, A. D. / Price, A. D. F. / Dainty, A. R. J. (2009): Evaluation of key practices under the Local Improvement Finance Trust (LIFT) initiative for UK healthcare facilities. In: Engineering, Construction and Architectural Management, v. 16, n. 5 (September 2009).

    https://doi.org/10.1108/09699980910988393

  4. Ochieng, E. G. / Price, A. D. F. / Ruan, X. / Egbu, C. O. / Moore, D. (2013): The effect of cross‐cultural uncertainty and complexity within multicultural construction teams. In: Engineering, Construction and Architectural Management, v. 20, n. 3 (April 2013).

    https://doi.org/10.1108/09699981311324023

  5. Adetunji, I. / Price, A. D. F. / Fleming, P. (2008): Achieving sustainability in the construction supply chain. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 161, n. 3 (September 2008).

    https://doi.org/10.1680/ensu.2008.161.3.161

  6. Walton, J. S. / El-Haram, M. / Castillo, N. H. / Horner, R. M. W. / Price, A. D. F. / Hardcastle, C. (2005): Integrated assessment of urban sustainability. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 158, n. 2 (June 2005).

    https://doi.org/10.1680/ensu.2005.158.2.57

  7. Walton, J. S. / El-Haram, M. / Castillo, N. H. / Horner, R. M. W. / Price, A. D. F. / Hardcastle, C. (2005): Integrated assessment of urban sustainability. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 158, n. 2 (June 2005).

    https://doi.org/10.1680/ensu.158.2.57.67123

  8. Tah, J. H. M. / Price, A. D. F. (2008): A Data Base Management System (DBMS) for Formwork Design Applications. In: Computer-Aided Civil and Infrastructure Engineering, v. 5, n. 1 (November 2008).

    https://doi.org/10.1111/j.1467-8667.1990.tb00041.x

  9. Aouad, C. / Price, A. D. F. (1993): An Integrated ComDuter Model to Aid the Planning of Concrete Structures. In: Computer-Aided Civil and Infrastructure Engineering, v. 8, n. 1 (January 1993).

    https://doi.org/10.1111/j.1467-8667.1993.tb00190.x

  10. Adamu, Z. A. / Price, A. D. F. / Cook, M. J. (2012): Performance evaluation of natural ventilation strategies for hospital wards – A case study of Great Ormond Street Hospital. In: Building and Environment, v. 56 (October 2012).

    https://doi.org/10.1016/j.buildenv.2012.03.011

  11. Tah, J. H. M. / Price, A. D. F. (1991): Computer-based modelling of concrete pressures on complex shaped wall formwork. In: Building and Environment, v. 26, n. 2 (January 1991).

    https://doi.org/10.1016/0360-1323(91)90030-f

  12. Bassioni, H. A. / Price, A. D. F. / Hassan, T. M. (2004): Performance Measurement in Construction. In: Journal of Management in Engineering (ASCE), v. 20, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:2(42)

  13. Jawahar-Nesan, L. / Price, A. D. F. (1997): Formulation of Best Practices for Owner's Representatives. In: Journal of Management in Engineering (ASCE), v. 13, n. 1 (January 1997).

    https://doi.org/10.1061/(asce)0742-597x(1997)13:1(44)

  14. Lema, N. M. / Price, A. D. F. (1995): Benchmarking: Performance Improvement Toward Competitive Advantage. In: Journal of Management in Engineering (ASCE), v. 11, n. 1 (January 1995).

    https://doi.org/10.1061/(asce)0742-597x(1995)11:1(28)

  15. Olomolaiye, P. O. / Price, A. D. F. (1989): Construction operatives — Motivation and productivity. Great interdependence between motivation variables in construction operatives. Wrong to concentrate management action only on most important. In: Bâtiment International / Building Research and Practice, v. 17, n. 2 (March 1989).

    https://doi.org/10.1080/01823328908726951

  16. Lema, N. M. / Price, A. D. F. (1996): Construction process performance variability: Focus on labour productivity. In: Building Research & Information, v. 24, n. 6 ( 1996).

    https://doi.org/10.1080/09613219608727554

  17. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity, Part B. Part B illustrates the procedures for evaluating basic times and balancing gang sizes for various situations in brickwork and blockwork applications. In: Building Research & Information, v. 23, n. 3 ( 1995).

    https://doi.org/10.1080/09613219508727448

  18. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity: Part A. Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. In: Building Research & Information, v. 23, n. 2 ( 1995).

    https://doi.org/10.1080/09613219508727433

  19. Price, A. D. F. (1992): Construction operative motivation and productivity. Research indicates that there is a distinct relationship between remuneration, motivation and site efficiency. In: Building Research & Information, v. 20, n. 3 ( 1992).

    https://doi.org/10.1080/09613219208727204

  20. Price, A. D. F. / Lu, J. (2013): Impact of hospital space standardization on patient health and safety. In: Architectural Engineering and Design Management, v. 9, n. 1 (February 2013).

    https://doi.org/10.1080/17452007.2012.688522

  21. Tah, J. H. M. / Price, A. D. F. (1991): Interactive computer-aided formwork design. In: Computers & Structures, v. 41, n. 6 (January 1991).

    https://doi.org/10.1016/0045-7949(91)90253-i

  22. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New approach for optimizing earth moving operations [Part 1]. In: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 3 (August 1994).

    https://doi.org/10.1680/itran.1994.26795

  23. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New Approach for optimizing earth moving operations [Part II]. In: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 4 (January 1994).

    https://doi.org/10.1680/itran.1994.27136

  24. Kululanga, G. K. / McCaffer, R. / Price, A. D. F. / Edum-Fotwe, F. (1999): Learning Mechanisms Employed by Construction Contractors. In: Journal of Construction Engineering and Management, v. 125, n. 4 (August 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:4(215)

  25. Soetanto, R. / Dainty, A. R. J. / Glass, J. / Price, A. D. F. (2006): A framework for objective structural frame selection. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 159, n. 1 (February 2006).

    https://doi.org/10.1680/stbu.2006.159.1.45

  26. Kululanga, G. K. / Price, A. D. F. / McCaffer, R. (2002): Empirical Investigation of Construction Contractors' Organizational Learning. In: Journal of Construction Engineering and Management, v. 128, n. 5 (October 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:5(385)

  27. Bassioni, H. A. / Price, A. D. F. / Hassan, T. M. (2005): Building a conceptual framework for measuring business performance in construction: an empirical evaluation. In: Construction Management and Economics, v. 23, n. 5 (June 2005).

    https://doi.org/10.1080/0144619042000301401

  28. Muya, M. / Price, A. D. F. / Edum-Fotwe, F. T. (2006): Overview of funding for construction craft skills training in Sub‐Saharan Africa: a case study of Zambia. In: Construction Management and Economics, v. 24, n. 2 (February 2006).

    https://doi.org/10.1080/01446190500310585

  29. Kaka, Ammar P. / Price, A. D. F. (1991): Net cashflow models: Are they reliable?. In: Construction Management and Economics, v. 9, n. 3 (June 1991).

    https://doi.org/10.1080/01446199100000023

  30. Kaka, A. P. / Price, A. D. F. (1993): Modelling standard cost commitment curves for contractors' cash flow forecasting. In: Construction Management and Economics, v. 11, n. 4 (July 1993).

    https://doi.org/10.1080/01446199300000027

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine