- The problem of ranking CO2 abatement measures: A methodological proposal. In: Sustainable Cities and Society, v. 26 (October 2016). (2016):
- The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations. In: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 11 (September 2015). (2015):
- Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects. In: Automation in Construction, v. 105 (September 2019). (2019):
- The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm. In: Automation in Construction, v. 29 (January 2013). (2013):