J. L. Ponz-Tienda
- The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects. In: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 8 (July 2018). (2018):
- A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags. In: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 6 (May 2017). (2017):
- Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags. In: Automation in Construction, v. 77 (May 2017). (2017):