Pierangelo Pistoletti
- Il Ponte strallato sul fiume Okavango. In: Strade e Autostrade, v. 26, n. 160 (July 2023). (2023):
- I Viadotti sulla fiumara Favazzina: la realizzazione delle opere. In: Strade e Autostrade, v. 16, n. 94 (July 2012). (2012):
- (2021): Cable stayed bridge over the Crati river in Cosenza. Presented at: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
- (2021): Railway lines of R.F.I. and Ferrotramviaria Crossing in Bari – "Adriatico" cable stayed bridge. Presented at: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
- Sulla TEEM, il viadotto Lambro a basso impatto ambientale. In: Strade e Autostrade, v. 19, n. 112 (July 2015). (2015):
- (2016): Marchetti Viaduct - Design and assembling of a bowstring arch bridge with a span of 250m. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Passarella pedonale strallata in zona Ruffolo (Siena). Presented at: Avanzamenti nelle costruzioni in acciaio / Advances in Steel Constructions, XX Congresso C.T.A.. :
- L'impermeabilizzazione di un impalcato a piastra ortotropa. In: Strade e Autostrade, v. 11, n. 63 (May 2007). (2007):
- Le viaduc du Verrand en acier autopatinable dans les Alpes. In: Bulletin ouvrages métalliques, n. 3 ( 2004). (2004):