Alan Phear
- High Speed 1, UK: a silty sustainable earthworks case study. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 164, n. 2 (April 2011). (2011):
- Carbon dioxide from earthworks: a bottom-up approach. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 2 (May 2011). (2011):
- Westlink/M1, Northern Ireland. In: The Arup Journal, v. 44, n. 2 ( 2009). (2009):