John G. Perry
- The New Engineering Contract: principles of design and risk allocation. In: Engineering, Construction and Architectural Management, v. 2, n. 3 (March 1995). (1995):
- Experiences of the use of the New Engineering Contract. In: Engineering, Construction and Architectural Management, v. 2, n. 4 (April 1995). (1995):
- The barriers to entry into the PFI market. In: Engineering, Construction and Architectural Management, v. 4, n. 3 (March 1997). (1997):
- Target cost contracts: an analysis of the interplay between fee, target, share and price. In: Engineering, Construction and Architectural Management, v. 7, n. 2 (February 2000). (2000):
- Strategies for insuring subcontracted works. In: Construction Management and Economics, v. 17, n. 3 (May 1999). (1999):