Jong-Kwan Park
- 토압식 쉴드TBM의 후드부 시뮬레이션 장비 시스템 개발에 대한 연구 (Development of simulation equipment system on EPB shield TBM hood operation). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 16, n. 2 ( 2014). (2014):
- Numerical analysis for semi cut and cover tunnelling method. In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 15, n. 2 ( 2013). (2013):