Hyung-Keun Park
- Prediction of cement infiltration depth in coarse-grained soil. In: KSCE Journal of Civil Engineering, v. 17, n. 5 (December 2012). (2012):
- Integrated design management system for mega infrastructure projects: A case study in Korea. In: KSCE Journal of Civil Engineering, v. 12, n. 2 (March 2008). (2008):
- Categorical relationship approach as an alternative risk analysis for predicting cost contingency. In: KSCE Journal of Civil Engineering, v. 8, n. 2 (March 2004). (2004):
- Cash flow forecasting in construction project. In: KSCE Journal of Civil Engineering, v. 8, n. 3 (May 2004). (2004):