Gonzalo Osborne
- Feeding System of the Segments in the Main Span for the New Champlain Cable-Stayed Bridge. Presented at: Structures Congress 2017, April 6–8, 2017, Denver, Colorado. (2017):
- Bridge over the Cádiz bay, Spain. Presented at: Engineering for Progress, Nature and People, IABSE Symposium, 3-5 September 2014, Madrid, Spain. (2014):
- Innovative Means and Methods for the New Champlain Bridge. Presented at: Engineering the Future; IABSE Symposium, Vancouver, Canada, 21-23 September 2017. (2017):
- Urban Bridges - Latest Experiences in Andalusia. Presented at: IABSE Symposium, Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, 22-24 September 2010. (2010):
- Second Bay of Cadiz Bridge - Latest Construction Challenges. Presented at: IABSE Symposium, Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, 22-24 September 2010. (2010):
- New Removable Bridge over the Bay of Cadiz. Presented at: IABSE Symposium, Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, 22-24 September 2010. (2010):