Rosário Oliveira
- Plans of Control, Measurement and Monitoring with Risk Assessment Application to Rehabilitation works. In: Procedia Structural Integrity, v. 5 ( 2017). (2017):
- Monitoring and Control of Schedule and Cost Performance in Facade Conservation. In: Procedia Structural Integrity, v. 22 ( 2019). (2019):
- Analysis of mortars used in the rehabilitation of wall coating. In: Procedia Structural Integrity, v. 22 ( 2019). (2019):