J. T. O'Connor
- Procurement of Design-Build Services: Two-Phase Selection for Highway Projects. In: Journal of Management in Engineering (ASCE), v. 25, n. 1 (January 2009). (2009):
- Redesign of Vendor-Data Processes for Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 12, n. 5 (September 1996). (1996):
- Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities. In: Journal of Management in Engineering (ASCE), v. 11, n. 3 (May 1995). (1995):
- Pipe Manipulator Enhancements for Increased Automation. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989). (1989):
- Improving Highway Specifications for Constructibility. In: Journal of Construction Engineering and Management, v. 117, n. 2 (June 1991). (1991):
- ComputerāAided Planning for Heavy Lifts. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993). (1993):
- Routing Large Vehicles on Industrial Construction Sites. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995). (1995):
- ArcSite: Enhanced GIS for Construction Site Layout. In: Journal of Construction Engineering and Management, v. 122, n. 4 (December 1996). (1996):