Tony Nicholls
- Repairs to electro-slag weld defects on M4 Boston Manor viaduct. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 168, n. 3 (September 2015). (2015):
- Gade Valley Viaduct: Management and Resolution of a Critical Fatigue Life Shortfall. In: Structural Engineering International, v. 29, n. 4 (October 2019). (2019):
- Collaboration in an emergency: repairing London's M4 Boston Manor viaduct. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 167, n. 1 (February 2014). (2014):
- Repairs to electro-slag weld defects on M4 Boston Manor viaduct. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 168, n. 3 (September 2015). (2015):
- Management of the M4 Elevated Section substructures. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 170, n. 3 (September 2017). (2017):