- (2024): BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning. In: Buildings, v. 14, n. 12 (18 December 2024).
- Performance-Based Seismic Evaluation and Retrofit of Suspension Bridges. Presented at: Structures Congress 2013, Pittsburgh, Pennsylvania, May 2-4, 2013. :
- Shape control of smart composite plate with non-rectangular piezoelectric actuators. In: Composite Structures, v. 66, n. 1-4 (October 2004). (2004):