-
Arkin, H. / Navon, R. / Burg, I. (1997): HVAC with thermal energy storage: Optimal design and optimal scheduling. In: Building Services Engineering Research and Technology, v. 18, n. 1 (February 1997).
https://doi.org/10.1177/014362449701800105
-
Navon, R. / Arkin, H. (1994): Feasibility of direct-indirect evaporative cooling for residences, based on studies with a desert cooler. In: Building and Environment, v. 29, n. 3 (July 1994).
https://doi.org/10.1016/0360-1323(94)90040-x
-
Sacks, R. / Navon, R. / Brodetskaia, I. (2006): Interpretation of Automatically Monitored Lifting Equipment Data for Project Control. In: Journal of Computing in Civil Engineering, v. 20, n. 2 (March 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:2(111)
-
Sacks, R. / Navon, R. / Goldschmidt, E. (2003): Building Project Model Support for Automated Labor Monitoring. In: Journal of Computing in Civil Engineering, v. 17, n. 1 (January 2003).
https://doi.org/10.1061/(asce)0887-3801(2003)17:1(19)
-
Navon, R. / Kolton, O. (2007): Algorithms for Automated Monitoring and Control of Fall Hazards. In: Journal of Computing in Civil Engineering, v. 21, n. 1 (January 2007).
https://doi.org/10.1061/(asce)0887-3801(2007)21:1(21)
-
Navon, R. / Shapira, A. / Shechori, Y. (2000): Automated Rebar Constructability Diagnosis. In: Journal of Construction Engineering and Management, v. 126, n. 5 (October 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:5(389)
-
Warszawski, A. / Navon, R. (1991): Robot for Interior‐Finishing Works. In: Journal of Construction Engineering and Management, v. 117, n. 3 (September 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:3(402)
-
Rosenfeld, Y. / Navon, R. / Cohen, L. (1998): Methodology for Prioritizing Cost-Effective Construction Technologies. In: Journal of Construction Engineering and Management, v. 124, n. 3 (May 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:3(176)
-
Navon, R. / Shpatnitsky, Y. (2005): Field Experiments in Automated Monitoring of Road Construction. In: Journal of Construction Engineering and Management, v. 131, n. 4 (April 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:4(487)
-
Navon, R. / Retik, A. (1997): Programming construction robots using virtual reality techniques. In: Automation in Construction, v. 5, n. 5 (February 1997).
https://doi.org/10.1016/s0926-5805(96)00162-8
-
Navon, R. (1995): Conceptual design of a flooring robot: development methodology and results. In: Automation in Construction, v. 4, n. 3 (October 1995).
https://doi.org/10.1016/0926-5805(95)00008-o
-
Navon, R. (2007): Research in automated measurement of project performance indicators. In: Automation in Construction, v. 16, n. 2 (March 2007).
https://doi.org/10.1016/j.autcon.2006.03.003
-
Isaac, S. / Navon, R. (2013): A graph-based model for the identification of the impact of design changes. In: Automation in Construction, v. 31 (May 2013).
https://doi.org/10.1016/j.autcon.2012.11.043
-
McCrea, A. / Navon, R. (2004): Application of GA in optimal robot selection for bridge restoration. In: Automation in Construction, v. 13, n. 6 (November 2004).
https://doi.org/10.1016/j.autcon.2004.05.002
-
Navon, R. (2000): Process and quality control with a video camera, for a floor-tilling robot. In: Automation in Construction, v. 10, n. 1 (November 2000).
https://doi.org/10.1016/s0926-5805(99)00044-8
-
McCrea, A. / Chamberlain, D. / Navon, R. (2002): Automated inspection and restoration of steel bridges—a critical review of methods and enabling technologies. In: Automation in Construction, v. 11, n. 4 (June 2002).
https://doi.org/10.1016/s0926-5805(01)00079-6
-
Navon, R. / Goldschmidt, E. / Shpatnisky, Y. (2004): A concept proving prototype of automated earthmoving control. In: Automation in Construction, v. 13, n. 2 (March 2004).
https://doi.org/10.1016/j.autcon.2003.08.002
-
Navon, R. / Berkovich, O. (2005): Development and On-Site Evaluation of an Automated Materials Management and Control Model. In: Journal of Construction Engineering and Management, v. 131, n. 12 (December 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:12(1328)
-
Sacks, R. / Navon, R. / Brodetskaia, I. / Shapira, A. (2005): Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:5(604)
-
Navon, R. / Kolton, O. (2006): Model for Automated Monitoring of Fall Hazards in Building Construction. In: Journal of Construction Engineering and Management, v. 132, n. 7 (July 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:7(733)
-
Warszawski, A. / Becker, R. / Navon, R. (2007): Strategic Planning for Building Research—A Process Oriented Methodology. In: Journal of Construction Engineering and Management, v. 133, n. 9 (September 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:9(710)
-
Navon, R. / Berkovich, O. (2006): An automated model for materials management and control. In: Construction Management and Economics, v. 24, n. 6 (June 2006).
https://doi.org/10.1080/01446190500435671
-
Navon, R. / Shpatnitsky, Y. (2005): A model for automated monitoring of road construction. In: Construction Management and Economics, v. 23, n. 9 (November 2005).
https://doi.org/10.1080/01446190500183917
-
Navon, R. / Arkin, H. (1993): Economic Comparison Of An Air-Conditioner And A Desert Cooler For Residences In Arid Areas. In: Construction Management and Economics, v. 11, n. 1 (January 1993).
https://doi.org/10.1080/01446199300000065
-
Navon, R. (1995): Resource-based model for automatic cash-flow forecasting. In: Construction Management and Economics, v. 13, n. 6 (November 1995).
https://doi.org/10.1080/01446199500000058
-
Warszawski, A. / Navon, R. (1998): Implementation of Robotics in Building: Current Status and Future Prospects. In: Journal of Construction Engineering and Management, v. 124, n. 1 (January 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:1(31)