-
Mir, Mostafa / Nasirzadeh, Farnad / Zakeri, Morteza / Hill, Aron / Karmakar, Chandan (2024): Assessing neural markers of attention during exposure to construction noise using machine learning classification of electroencephalogram data. In: Building and Environment, v. 261 (August 2024).
https://doi.org/10.1016/j.buildenv.2024.111754
-
Madihi, Mohammad Hosein / Shirzadi Javid, Ali Akbar / Nasirzadeh, Farnad: Enhancing risk assessment: an improved Bayesian network approach for analyzing interactions among risks. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-07-2023-0774
-
Mahamivanan, Hadi / Ghassemi, Navid / Tayarani Darbandy, Mohammad / Shoeibi, Afshin / Hussain, Sadiq / Nasirzadeh, Farnad / Alizadehsani, Roohallah / Nahavandi, Darius / Khosravi, Abbas / Nahavandi, Saeid: Material recognition for construction quality monitoring using deep learning methods. In: Construction Innovation.
https://doi.org/10.1108/ci-04-2022-0074
-
Mir, Mostafa / Nasirzadeh, Farnad / Bereznicki, Hannah / Enticott, Peter / Lee, SangHyun / Mills, Anthony (2023): Construction noise effects on human health: Evidence from physiological measures. In: Sustainable Cities and Society, v. 91 (April 2023).
https://doi.org/10.1016/j.scs.2023.104470
-
Mir, Mostafa / Nasirzadeh, Farnad / Bereznicki, Hannah / Enticott, Peter / Lee, SangHyun (2022): Investigating the effects of different levels and types of construction noise on emotions using EEG data. In: Building and Environment, v. 225 (November 2022).
https://doi.org/10.1016/j.buildenv.2022.109619
-
Vahabi, Ali / Nasirzadeh, Farnad / Mills, Anthony (2022): Influence of briefing clarity on construction projects: a fuzzy hybrid simulation approach. In: Construction Management and Economics, v. 40, n. 4 (February 2022).
https://doi.org/10.1080/01446193.2022.2037148
-
Vahabi, Ali / Nasirzadeh, Farnad / Mills, Anthony (2021): Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. In: Engineering, Construction and Architectural Management, v. 30, n. 2 (October 2021).
https://doi.org/10.1108/ecam-07-2021-0618
-
Akbari, Mahmood / Kabir, H. M. Dipu / Khosravi, Abbas / Nasirzadeh, Farnad (2022): ANN-Based LUBE Model for Interval Prediction of Compressive Strength of Concrete. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (February 2022).
https://doi.org/10.1007/s40996-021-00684-x
-
Mir, Mostafa / Kabir, H. M. Dipu / Nasirzadeh, Farnad / Khosravi, Abbas (2021): Neural network-based interval forecasting of construction material prices. In: Journal of Building Engineering, v. 39 (July 2021).
https://doi.org/10.1016/j.jobe.2021.102288
-
Bayat, Morteza / Khanzadi, Mostafa / Nasirzadeh, Farnad (2019): Determining Optimal Capital Structure and Concession Period Length in BOT Scheme Using Trilateral Bargaining Game Model. In: Journal of Infrastructure Systems, v. 25, n. 1 (March 2019).
https://doi.org/10.1061/(asce)is.1943-555x.0000456
-
Mahjoubpour, Behzad / Nasirzadeh, Farnad / Mohammad Hosein Zadeh Golabchi, Mahmoud / Ramezani Khajehghiasi, Maryam / Mir, Mostafa (2018): Modeling of workers’ learning behavior in construction projects using agent-based approach. The case study of a steel structure project. In: Engineering, Construction and Architectural Management, v. 25, n. 4 (May 2018).
https://doi.org/10.1108/ecam-07-2016-0166
-
Nasirzadeh, Farnad / Carmichael, David G. / Jarban, Mohammad Jafar / Rostamnezhad, Mozhdeh (2019): Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. In: Engineering, Construction and Architectural Management, v. 26, n. 7 (August 2019).
https://doi.org/10.1108/ecam-08-2017-0150
-
Rostamnezhad, Mozhdeh / Nasirzadeh, Farnad / Khanzadi, Mostafa / Jarban, Mohammad Jafar / Ghayoumian, Masoud (2020): Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project. In: Engineering, Construction and Architectural Management, v. 27, n. 7 ( 2020).
https://doi.org/10.1108/ecam-01-2018-0031
-
Nasirzadeh, Farnad / Kabir, H. M. Dipu / Akbari, Mahmood / Khosravi, Abbas / Nahavandi, Saeid / Carmichael, David G. (2020): ANN-based prediction intervals to forecast labour productivity. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).
https://doi.org/10.1108/ecam-08-2019-0406
-
Bayat, Morteza / Khanzadi, Mostafa / Nasirzadeh, Farnad (2020): Bargaining Game Model to Determine Concessionary Items in Build-Operate-Transfer Contracts. In: Journal of Construction Engineering and Management, v. 146, n. 2 (February 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001774
-
Mahami, Hadi / Nasirzadeh, Farnad / Hosseininaveh Ahmadabadian, Ali / Nahavandi, Saeid (2019): Automated Progress Controlling and Monitoring Using Daily Site Images and Building Information Modelling. In: Buildings, v. 9, n. 3 (March 2019).
https://doi.org/10.3390/buildings9030070
-
Mahami, Hadi / Nasirzadeh, Farnad / Hosseininaveh Ahmadabadian, Ali / Esmaeili, Farid / Nahavandi, Saeid (2019): Imaging network design to improve the automated construction progress monitoring process. In: Construction Innovation, v. 19, n. 3 (July 2019).
https://doi.org/10.1108/ci-07-2018-0059
-
Shoar, Shahab / Nasirzadeh, Farnad / Zarandi, Hamid Reza (2019): Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. In: Construction Innovation, v. 19, n. 1 (March 2019).
https://doi.org/10.1108/ci-07-2018-0057
-
Khanzadi, Mostafa / Nasirzadeh, Farnad / Mir, Mostafa / Nojedehi, Pouya (2018): Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. In: Construction Innovation, v. 18, n. 1 (January 2018).
https://doi.org/10.1108/ci-06-2015-0034
-
Moradi, Saeed / Nasirzadeh, Farnad / Golkhoo, Farzaneh (2015): A hybrid SD–DES simulation approach to model construction projects. In: Construction Innovation, v. 15, n. 1 (January 2015).
https://doi.org/10.1108/ci-10-2013-0045
-
Nasirzadeh, Farnad / Mazandaranizadeh, Hamed / Rouhparvar, Mehdi (2016): Quantitative Risk Allocation in Construction Projects Using Cooperative-Bargaining Game Theory. In: International Journal of Civil Engineering, v. 14, n. 3 (April 2016).
https://doi.org/10.1007/s40999-016-0011-8
-
Nojedehi, Pouya / Nasirzadeh, Farnad (2016): A hybrid simulation approach to model and improve construction labor productivity. In: KSCE Journal of Civil Engineering, v. 21, n. 5 (August 2016).
https://doi.org/10.1007/s12205-016-0278-y
-
Mirzaei, Ali / Nasirzadeh, Farnad / Parchami Jalal, Majid / Zamani, Yasin (2018): 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. In: Journal of Construction Engineering and Management, v. 144, n. 7 (July 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001504
-
Ghoddousi, Parviz / Nasirzadeh, Farnad / Hashemi, Hassan (2018): Evaluating Highway Construction Projects' Sustainability Using a Multicriteria Group Decision-Making Model Based on Bootstrap Simulation. In: Journal of Construction Engineering and Management, v. 144, n. 9 (September 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001514
-
Khanzadi, Mostafa / Nasirzadeh, Farnad / Alipour, Majid (2012): Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. In: Automation in Construction, v. 22 (March 2012).
https://doi.org/10.1016/j.autcon.2011.09.015
-
Nasirzadeh, Farnad / Afshar, Abbas / Khanzadi, Mostafa / Howick, Susan (2008): Integrating system dynamics and fuzzy logic modelling for construction risk management. In: Construction Management and Economics, v. 26, n. 11 (November 2008).
https://doi.org/10.1080/01446190802459924
-
Nasirzadeh, Farnad / Afshar, Abbas / Khanzadi, Mostafa (2008): Dynamic risk analysis in construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 8 (August 2008).
https://doi.org/10.1139/l08-035
-
Khanzadi, Mostafa / Nasirzadeh, Farnad / Dashti, Mohammad Saleh (2018): Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. In: Journal of Construction Engineering and Management, v. 144, n. 2 (February 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001430