Wafaa Nadim
- Live-work and adaptable housing in Egypt. A zero commuting concept, lessons learnt from informal developments. In: Smart and Sustainable Built Environment, v. 5, n. 3 (September 2016). (2016):
- Offsite production: a model for building down barriers. A European construction industry perspective. In: Engineering, Construction and Architectural Management, v. 18, n. 1 (January 2011). (2011):
- Standardization of optimization methodology of daylighting and shading strategy: a case study of an architectural design studio – the German University in Cairo, Egypt. In: Journal of Building Performance Simulation, v. 14, n. 1 (December 2020). (2020):
- Offsite production in the UK: the way forward? A UK construction industry perspective. In: Construction Innovation, v. 10, n. 2 (April 2010). (2010):
- Offsite Production in the UK: The Construction Industry and Academia. In: Architectural Engineering and Design Management, v. 5, n. 3 (January 2009). (2009):
- The nD-based Computer Game: Engaging School Children in the Construction Design Process. In: Architectural Engineering and Design Management, v. 3, n. 4 (January 2007). (2007):