R. M. W. Musson
- Intensity-based seismic risk assessment. In: Soil Dynamics and Earthquake Engineering, v. 20, n. 5-8 (December 2000). (2000):
- Methodological considerations of probabilistic seismic hazard mapping. In: Soil Dynamics and Earthquake Engineering, v. 21, n. 5 (July 2001). (2001):
- Determination of Design Earthquakes in Seismic Hazard Analysis Through Monte Carlo Simulation. In: Journal of Earthquake Engineering, v. 3, n. 4 ( 1999). (1999):
- The seismicity of ghana. In: Bulletin of Earthquake Engineering, v. 12, n. 1 (December 2013). (2013):
- Ground motion and probabilistic hazard. In: Bulletin of Earthquake Engineering, v. 7, n. 3 (March 2009). (2009):
- Objective assessment of source models for seismic hazard studies: with a worked example from UK data. In: Bulletin of Earthquake Engineering, v. 10, n. 2 (August 2011). (2011):
- Design Earthquakes in the U.K.. In: Bulletin of Earthquake Engineering, v. 2, n. 1 ( 2004). (2004):
- A history of British seismology. In: Bulletin of Earthquake Engineering, v. 11, n. 3 (May 2013). (2013):