Prathap Muniyappa
- Innovations and challenges in design and construction of underground Mumbai Metro Line 3 – Lot UG‐04 and UG‐06. In: Geomechanics and Tunnelling, v. 16, n. 2 (March 2023). (2023):
- Design of a NATM crossover at Mumbai metro line 3. In: Geomechanics and Tunnelling, v. 13, n. 6 (December 2020). (2020):