0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Moselhi, O. / Nicholas, M. J. (2008): Expert System Tools for Construction Planning and Control. In: Computer-Aided Civil and Infrastructure Engineering, v. 3, n. 1 (November 2008).

    https://doi.org/10.1111/j.1467-8667.1988.tb00157.x

  2. Marzouk, M. / Moselhi, O. (2003): A decision support tool for construction bidding. In: Construction Innovation, v. 3, n. 2 (June 2003).

    https://doi.org/10.1108/14714170310814882

  3. Adhikari, R. S. / Moselhi, O. / Bagchi, A. / Rahmatian, A. (2016): Tracking of Defects in Reinforced Concrete Bridges Using Digital Images. In: Journal of Computing in Civil Engineering, v. 30, n. 5 (September 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000566

  4. Hassanein, A. / Moselhi, O. (2004): Planning and Scheduling Highway Construction. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(638)

  5. Hegazy, T. / Fazio, P. / Moselhi, O. (1994): Developing Practical Neural Network Applications Using Back-Propagation. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 2 (March 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00369.x

  6. Adhikari, R. S. / Moselhi, O. / Bagchi, A. (2014): Image-based retrieval of concrete crack properties for bridge inspection. In: Automation in Construction, v. 39 (April 2014).

    https://doi.org/10.1016/j.autcon.2013.06.011

  7. Moselhi, O. / Hassanein, A. (2003): Optimized Scheduling of Linear Projects. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:6(664)

  8. Li, J. / Moselhi, O. / Alkass, S. (2006): Forecasting Project Status by Using Fuzzy Logic. In: Journal of Construction Engineering and Management, v. 132, n. 11 (November 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:11(1193)

  9. Fazio, P. / Moselhi, O. / Théberge, P. / Revay, S. (1988): Design impact of construction fast-track. In: Construction Management and Economics, v. 6, n. 3 (September 1988).

    https://doi.org/10.1080/01446198800000018

  10. Moselhi, O. / Fazio, P. / Zielinski, Z. (1978): Simplified analysis of wall-frame structures. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 5, n. 2 (June 1978).

    https://doi.org/10.1139/l78-030

  11. Mamet, J. C. / Moselhi, O. (1985): Outline of current analysis procedure for CANDU 600 MW reactor buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 12, n. 4 (December 1985).

    https://doi.org/10.1139/l85-093

  12. Moselhi, O. / Gong, D. / El-Rayes, K. (1997): Estimating weather impact on the duration of construction activities. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 24, n. 3 (June 1997).

    https://doi.org/10.1139/l96-122

  13. Li, J. / Moselhi, O. / Alkass, S. (2005): A reasoning process in support of integrated project control. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (June 2005).

    https://doi.org/10.1139/l04-118

  14. Fazio, P. / Moselhi, O. / Théberge, P. / Revay, S. (1988): Fast-tracking of construction projects: a case study. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 15, n. 4 (August 1988).

    https://doi.org/10.1139/l88-068

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine