Hans Mortier
- TUST special issue – HSL tunnels Oude Maas and Dordtsche Kil. In: Tunnelling and Underground Space Technology, v. 123 (May 2022). (2022):
- Shaft Design for the Rijnlandroute Bored Tunnel. In: Structural Engineering International, v. 30, n. 4 (October 2020). (2020):
- (2013): Assessment of structural Condition of an existing Railway Viaduct after excessive Deformations due to nearby tunnelling Works. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2013): Tunneling underneath historical buildings of Delft. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- Detailing Concrete Structures of a Top-Down Built Urban Tunnel Using Diaphragm Walls. In: Structural Engineering International, v. 23, n. 4 (November 2013). (2013):
- Assuring the Required Remaining Lifetime of a Railway Viaduct Heavily Deformed during Tunnel Execution. In: Structural Engineering International, v. 23, n. 4 (November 2013). (2013):
- Design and execution of the strengthening of the Muiderbridge. In: Bauingenieur, v. 85, n. 6 (June 2010). (2010):
- Le tunnel du Pannerdensch Kanaal. Le premier tunnel foré français aux Pays-Bas. In: Travaux, n. 774 (April 2001). (2001):