S. J. Moon
- Phase II benchmark control problem for seismic response of cable-stayed bridges. In: Journal of Structural Control, v. 10, n. 3-4 ( 2003). (2003):
- Longest bi-directional road tunnel planning for phased construction in Korea. In: Tunnelling and Underground Space Technology, v. 21, n. 3-4 (May 2006). (2006):
- Adaptive bang-bang control for the vibration control of structures under earthquakes. In: Earthquake Engineering and Structural Dynamics, v. 32, n. 13 (10 November 2003). (2003):