0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Thach, Thao Nguyen / Moon, Hyosoo / Pham, Hoang Duy / Kwon, Nahyun / Ahn, Yonghan: Construction Safety Innovation and Barriers in Different Company Types and Sizes: A Survey in Vietnam. In: KSCE Journal of Civil Engineering.

    https://doi.org/10.1007/s12205-024-0779-z

  2. Moon, Hyosoo / Mirmotalebi, Seyedali / Jang, Youjin / Ahn, Yonghan / Kwon, Nahyun (2024): Risk Evaluation of Radioactive Concrete Structure Decommissioning in Nuclear Power Plants Using Fuzzy-AHP. In: Buildings, v. 14, n. 6 (19 June 2024).

    https://doi.org/10.3390/buildings14061536

  3. Chauhan, Hardik / Jang, Youjin / Pradhan, Surakshya / Moon, Hyosoo (2023): Personalized optimal room temperature and illuminance for maximizing occupant's mental task performance using physiological data. In: Journal of Building Engineering, v. 78 (November 2023).

    https://doi.org/10.1016/j.jobe.2023.107757

  4. Moon, Hyosoo / Park, Moonseo / Ahn, Yonghan / Kwon, Nahyun (2023): Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance. In: Journal of Management in Engineering (ASCE), v. 39, n. 1 (January 2023).

    https://doi.org/10.1061/(asce)me.1943-5479.0001097

  5. Kwon, Nahyun / Ahn, Yonghan / Son, Bo-Sik / Moon, Hyosoo (2021): Developing a machine learning-based building repair time estimation model considering weight assigning methods. In: Journal of Building Engineering, v. 43 (November 2021).

    https://doi.org/10.1016/j.jobe.2021.102627

  6. Moon, Hyosoo / Kim, Kwonhyun / Lee, Hyun-Soo / Park, Moonseo / Williams, Trefor P. / Son, Bosik / Chun, Jae-Youl (2020): Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis. In: Journal of Construction Engineering and Management, v. 146, n. 9 (September 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001873

  7. Moon, Hyosoo / Williams, Trefor P. / Lee, Hyun-Soo / Park, Moonseo (2020): Predicting project cost overrun levels in bidding stage using ensemble learning. In: Journal of Asian Architecture and Building Engineering, v. 19, n. 6 (June 2020).

    https://doi.org/10.1080/13467581.2020.1765171

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine