K. R. Molenaar
- Simulation of Overlapping Design Activities in Concurrent Engineering. In: Journal of Construction Engineering and Management, v. 137, n. 11 (November 2011). (2011):
- Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012). (2012):