Hiroshi Mizuno
- Vibration Control Of Kurushima Bridge Tower 5p Under Construction. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 563 (April 1997). (1997):
- (2012): Rapid replacement work on the Nishi-Meihan Expressway Miyuki Bridge. Presented at: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.