- Improving project management “closeout” phase outcomes: evidence from a large general contractor in Iran using “X-inefficiency theory”. In: Engineering, Construction and Architectural Management. :
- (2023): Developing a Reference Framework for Claim Management Office: A Multi-Method Approach of an International Construction Firm. In: Buildings, v. 13, n. 7 (28 June 2023).
- Optimal Buyer Credit Arrangements for Chinese Procured Dam-building Projects: An Iranian Perspective. In: KSCE Journal of Civil Engineering, v. 26, n. 12 (September 2022). (2022):
- Dispute root causes and prevention in Iranian public-private partnership projects: a causal-predictive model. In: Engineering, Construction and Architectural Management, v. 31, n. 1 (September 2022). (2022):
- Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (March 2022). (2022):