Seyed Meysam Mousavi
- (2023): An Integrated Multi-Criteria Decision Model to Select Sustainable Construction Projects under Intuitionistic Fuzzy Conditions. In: Buildings, v. 13, n. 4 (24 March 2023).
- (2022): A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets. In: Buildings, v. 12, n. 7 (5 July 2022).
- Imprecise earned duration model for time evaluation of construction projects with risk considerations. In: Automation in Construction, v. 111 (March 2020). (2020):
- Solving Construction Project Selection Problem By A New Uncertain Weighting and Ranking Based on Compromise Solution With Linear Assignment Approach. In: Journal of Civil Engineering and Management, v. 25, n. 3 (June 2019). (2019):