0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Heinz Meschitz

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Bucher, Ralf / Meschitz, Heinz (2011): Koordination und Durchführung der zeitgleichen Inbetriebnahme der 1 400-MVA-Wasserkraftanlage Merowe und des 500-kV-Höchstspannungsnetzes. In: Wasserwirtschaft, v. 101, n. 1-2 (February 2011).

    https://doi.org/10.1365/s35147-011-0009-8

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine