Donald A. Maxwell
- Activity-Based Costing as a Tool for Process Improvement Evaluations. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (March 2000). (2000):
- Construction Automation and Robotics—Pathway to Implementation. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995). (1995):
- Optimization of Crew Configurations Using Activity-Based Costing. In: Journal of Construction Engineering and Management, v. 124, n. 2 (March 1998). (1998):