Nuria Martin Chivelet
- Erratum to “Component-based SHGC determination of BIPV glazing for product comparison” [Energy Build. 320 (2024) 114592]. In: Energy and Buildings, v. 324 (December 2024). (2024):
- Photovoltaic self-sufficiency potential at a district scale in Madrid. A scalable methodology. In: Energy and Buildings, v. 323 (November 2024). (2024):
- Component-based SHGC determination of BIPV glazing for product comparison. In: Energy and Buildings, v. 320 (October 2024). (2024):
- Digitalising BIPV energy simulation: A cross tool investigation. In: Energy and Buildings, v. 318 (September 2024). (2024):