Michal Majka
- (2024): Design and Construction of the Flyover in the Intermodal Ferry Terminal in Świnoujście. Presented at: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2024): Design and Construction of an Arch Bridge over Railway Line no. 132 in Poland using BIM Tools. Presented at: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2013): Dynamic Serviceability and Traffic Safety Assessment and Upgrading of Historic Railway Bridges. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- A Numerical Model for Analysis of Dynamic Response of Bridges under Moving Trains. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004. (2004):
- Effects of speed, load and damping on the dynamic response of railway bridges and vehicles. In: Computers & Structures, v. 86, n. 6 (March 2008). (2008):
- Dynamic response of bridges to moving trains: A study on effects of random track irregularities and bridge skewness. In: Computers & Structures, v. 87, n. 19-20 (October 2009). (2009):
- (2016): Safety and Serviceability Assessment of Existing Railway Bridges in Poland. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Design Aspects of Integral Footbridges on Example of the Broadmeadow Estuary Footbridge. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):