Christoph Mahrenholtz
- (2023): Gap filler to eliminate the hole play between base plate and channel bolts installed in anchor channels to sustain higher seismic loads. Presented at: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023.
- Simulation of Tests on Cast-In and Postinstalled Column-to-Foundation Connections to Quantify the Effect of Cyclic Loading. In: Journal of Structural Engineering (ASCE), v. 142, n. 1 (January 2016). (2016):
- Three‐dimensional testing of fasteners. In: Structural Concrete, v. 24, n. 2 (April 2023). (2023):
- Behavior of Post-Installed Anchors Tested by Stepwise Increasing Cyclic Crack Protocols. In: ACI Structural Journal, v. 114, n. 3 (May 2017). (2017):
- Qualification and design of anchor channels with channel bolts according to the new EN 1992‐4 and ACI 318. In: Structural Concrete, v. 21, n. 1 (February 2020). (2020):
- New Design Methodology for Seismic Column-to-Foundation Anchorage Connections. In: ACI Structural Journal, v. 111, n. 5 (September 2014). (2014):
- Vereinheitlichung der Regeln im Stahlbetonbau und in der Befestigungstechnik für die Bemessung von Verbindungen. In: ce/papers, v. 1, n. 5-6 (December 2017). (2017):
- Retrofit of reinforced concrete frames with buckling-restrained braces. In: Earthquake Engineering and Structural Dynamics, v. 44, n. 1 (January 2015). (2015):
- Design of post-installed reinforcing bars as end anchorage or as bonded anchor. In: Engineering Structures, v. 100 (October 2015). (2015):