P. Lunardi
- Ground improvement by means of jet-grouting. In: Proceedings of the Institution of Civil Engineers - Ground Improvement, v. 1, n. 2 (April 1997). (1997):
- The cellular arch method: technical solution for the construction of the Milan railway's venezia station. In: Tunnelling and Underground Space Technology, v. 5, n. 4 ( 1990). (1990):
- Design aspects of the construction of the new apennines crossing on the A1 Milan-Naples motorway: the base tunnel. Presented at: AFTES - Journées techniques, Monaco, 2008. (2008):
- Méthodes de présoutènement et pré-étanchement pour les travaux en souterrain. Presented at: AFTES - Journées techniques, Lyon, 27-29 novembre, 1984. (1984):
- Tunnel de San Sasso. In: Travaux, n. 482 (May 1975). (1975):