Matthias Ludin
- (2022): Design and construction of the Second Hinterrhein-Bridge. Presented at: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022.
- Die Zweite Hinterrheinbrücke Reichenau – eine 100 Jahre jüngere Schwester. In: Stahlbau, v. 91, n. 5 (May 2022). (2022):
- (2018): Appropriate approaches to Health, Safety and Welfare during footbridge construction in developing countries. Presented at: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- Zweite Hinterrhenbrücke in Reichenau. Belastungsversuche zur Verifikation des Tragverhaltens. In: Brückenbau, v. 12, n. 1-2 ( 2020). (2020):
- (2014): Footbridges for Kenya. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- Footbridges for Kenya. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):