- (2020): Fast Checking of Drift Demand in Multi-Storey Buildings with Asymmetry. In: Buildings, v. 11, n. 1 (22 December 2020).
- Offsite modular construction for high-rise building: a case study in Hong Kong. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 172, n. 6 (November 2019). (2019):