Jinchan Liu
- PPP project price mode typologies: a China-based comparative case study. In: Engineering, Construction and Architectural Management, v. 31, n. 5 (March 2024). (2024):
- Structural Equation Model-Based Performance Measurement System for Transferring Ppp Water Projects: a China Perspective. In: Journal of Civil Engineering and Management, v. 30, n. 2 (6 February 2024). (2024):
- A phase-oriented evaluation framework for China's PPP projects. In: Engineering, Construction and Architectural Management, v. 29, n. 9 (August 2022). (2022):